DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
INTRACOASTAL UTILITIESICU_PW29131381026415

Start Test Date:08-FEB-1978 0000Aquifer:SURFICIAL AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):20053
Discharge Rate (gal/min):450Horizontal K (ft/day):
Hours Pumped:72Vertical K (ft/day):
Tested Interval Min. (ft BLS):106Storativity:.0027
Tested Interval Max. (ft BLS):115Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT GROUND WATER INV. - INTRACOASTAL UTIL. FEB 1978 - GERAGHTY & MILLER
Comments:

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
ICU_OBS
913138
1026415
COOPER-JACOB APPROXIMATION
610
21524
.0027
ICU_OBS
913138
1026415
NEUMAN-WITHERSPOON
610
18633

Page generated at: 04-OCT-2025 03:56 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?