DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
BABCOCK RANCH TCUC SITE PF-12JE-903420101919649

Start Test Date:24-OCT-2007 0000Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:APTTransmissivity (ft2/day):3700
Discharge Rate (gal/min):1150Horizontal K (ft/day):
Hours Pumped:154.15Vertical K (ft/day):
Tested Interval Min. (ft BLS):566Storativity:.0014
Tested Interval Max. (ft BLS):942Leakance (1/day):.016
No. Monitored Wells:2Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT JOHNSON ENGINEERING, MAY 2008; TOWN AND COUNTRY UTILITIES WELL COMPLETION AND TESTING REPORT
Comments:THE TEST WAS STOPPED PREMATURELY BY AN UNKNOWN PERSON WHO TURNED OFF THE PUMP. HOWEVER THE DATA COLLECTED WERE USEABLE

Page generated at: 04-OCT-2025 03:58 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?