DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
KISSIMMEE RIVER RESTORATION, SITE E,FAR WELL, DEEPKREFFD5976711241473

Start Test Date:07-DEC-1998 0000Aquifer:SURFICIAL AQUIFER SYSTEM
Test Type:SLUGTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):51.49
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):105Storativity:
Tested Interval Max. (ft BLS):115Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTH FLORIDA WMD WELL CONSTRUCTION AND GEOLOGIC TESTING ALONG TRANSECTS E AND F IN THE S-65A BASIN, KISSIMMEE RIVER SYSTEM, FLORIDA (DRAFT). DAVID BUTLER, FEBRUARY 1999152
Comments:COOPER ET AL (CONFINED AQUIFER SLUG TEST)

Page generated at: 28-SEP-2024 21:38 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?