DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
L2-TW
L2-PW2
672710
826687
Start Test Date:
06-NOV-2006 1200
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
APT
Transmissivity (ft2/day):
3476
Discharge Rate (gal/min):
325
Horizontal K (ft/day):
Hours Pumped:
72.5
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
810
Storativity:
.00011
Tested Interval Max. (ft BLS):
1160
Leakance (1/day):
No. Monitored Wells:
2
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CH2MHILL, ENGINEERING REPORT ON THE REHABILITATION AND TESTING OF TEST WELL L2-PW2 AT THE L-2 CANAL SITE, CLEWISTON, FLORIDA. FEBRUARY, 1007.
Comments:
T = AVERAGE VALUE, STORAGE COEFFICIENT ESTIMATED FROM BAROMETRIC EFFICIENCY USING JACOB (1940) ANALYSIS METHOD.
Page generated at: 29-JUN-2024 07:03 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?