DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
LM-3680 PINE ISLAND UTILITIESLM-3681293159824411

Start Test Date:19-JUN-1991 1000Aquifer:LOWER HAWTHORN PRODUCING ZONE
Test Type:APTTransmissivity (ft2/day):24122
Discharge Rate (gal/min):700Horizontal K (ft/day):
Hours Pumped:72Vertical K (ft/day):
Tested Interval Min. (ft BLS):563Storativity:.0014
Tested Interval Max. (ft BLS):770Leakance (1/day):.00043
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT MISSIMER & ASSOC, JULY 1991; "WELLFIELD CONSTRUCTION, TESTING, AND WATER USE PERMIT INFORMATION FOR THE NEW GPIWA RO PLANT, PINE ISLAND CENTER, LEE COUNTY, FL
Comments:

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
LM-3680
293675
824827
WALTON
610
25.66
23800
.0014
.00043

Page generated at: 01-JUL-2024 06:39 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?