DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASMC-5057440785669257

Start Test Date:30-SEP-2000 2300Aquifer:INTERMEDIATE AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):13099
Discharge Rate (gal/min):370Horizontal K (ft/day):131
Hours Pumped:96Vertical K (ft/day):
Tested Interval Min. (ft BLS):299Storativity:.00015
Tested Interval Max. (ft BLS):399Leakance (1/day):.00017
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT MDM/MISSIMER INTERNATIONAL INC. OCTOBER, 2000. COLLIER COUNTY PUBLIC WORKS SOUTHERN REVERSE OSMOSIS WELLFIELD STUDY, COLLIER COUNTY, FL. PROJECT NO: FH8-812/9086-28655-DN.FWF
Comments:PARAMETER VALUES TAKEN FROM AVERAGE OF CURVE MATCHING METHOD OF DRAWDOWN, STRAIGHT LINE OF DRAWDOWN AND RECOVERY AT MON. WELL MC-5056.

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
MC-5056
441453
668622
JACOB STRAIGHT-LINE (1952)
735
13770
.00012
MC-5056
441453
668622
OTHER
735
14037
.00015
.00017
MC-5056
441453
668622
RECOVERY
735
10963
.00019
MC-5069
431099
673153
JACOB STRAIGHT-LINE (1952)
405
6016
.000057
MC-5069
431099
673153
OTHER
405
5829
.000083
.000024
MC-5069
431099
673153
RECOVERY
405
5829
.00011

Page generated at: 28-SEP-2024 20:17 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?