DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASMC-5060431503667245

Start Test Date:26-JUL-2000 0900Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):3062
Discharge Rate (gal/min):320Horizontal K (ft/day):
Hours Pumped:96Vertical K (ft/day):
Tested Interval Min. (ft BLS):650Storativity:.000085
Tested Interval Max. (ft BLS):762Leakance (1/day):.00013
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT MDM/MISSIMER INTERNATIONAL INC. OCTOBER, 2000. COLLIER COUNTY PUBLIC WORKS SOUTHERN REVERSE OSMOSIS WELLFIELD STUDY, COLLIER COUNTY, FL. PROJECT NO: FH8-812/9086-28655-DN.FWF
Comments:PARAMETER VALUES TAKEN FROM CURVE MATCHING METHOD OF DRAWDOWN, STRAIGHT LINE METHOD OF DRAWDOWN AND RECOVERY AT MON. WELL MC-5067.

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
MC-5067
432165
666434
JACOB STRAIGHT-LINE (1952)
807
3048
.000098
MC-5067
432165
666434
OTHER
807
2874
.000063
.00013
MC-5067
432165
666434
RECOVERY
807
3142
.000094

Page generated at: 01-JUL-2024 01:46 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?