DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASMC-5065431156673865

Start Test Date:30-SEP-2000 2300Aquifer:MID-HAWTHORN AQUIFER
Test Type:APTTransmissivity (ft2/day):5971
Discharge Rate (gal/min):380Horizontal K (ft/day):48
Hours Pumped:72Vertical K (ft/day):
Tested Interval Min. (ft BLS):296Storativity:.000083
Tested Interval Max. (ft BLS):420Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):17.6
SourceReferenceCitation Id
CONSULTANT MDM/MISSIMER INTERNATIONAL INC. OCTOBER, 2000. COLLIER COUNTY PUBLIC WORKS SOUTHERN REVERSE OSMOSIS WELLFIELD STUDY, COLLIER COUNTY, FL. PROJECT NO: FH8-812/9086-28655-DN.FWF
Comments:This well is the pumping well, aka HZ1-TP3. Used OW HZ1-MW3. Specific capacity calculated using the highest rate of 720 gpm.

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
MC-5056
441453
668622
JACOB STRAIGHT-LINE (1952)
735
13770
.00012
MC-5056
441453
668622
OTHER
735
14037
.00015
.00017
MC-5056
441453
668622
RECOVERY
735
10963
.00019
MC-5069
431099
673153
JACOB STRAIGHT-LINE (1952)
405
6016
.000057
MC-5069
431099
673153
OTHER
405
5829
.000083
.000024
MC-5069
431099
673153
RECOVERY
405
5829
.00011

Page generated at: 04-OCT-2025 08:38 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?