DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH PORT ST. LUCIE WELLFIELD
NPSL_PW17
871023
1080225
Start Test Date:
26-MAY-1982 0000
Aquifer:
SURFICIAL AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
4959
Discharge Rate (gal/min):
548
Horizontal K (ft/day):
Hours Pumped:
6
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
55
Storativity:
Tested Interval Max. (ft BLS):
105
Leakance (1/day):
No. Monitored Wells:
3
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER. DRILLING AND TESTING OF PRODUCTION WELLS 13 THROUGH 18, NORTH PORT WELL FIELD, PORT ST LUCIE, FL. MARCH, 1983
Comments:
MULTIPLE TESTS AT THIS WELLFIELD, REPORTED TRANSMISSIVITY IS FROM RECOVERY ANALYSIS OF PUMPED WELL
Page generated at: 30-JUN-2024 23:42 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?