DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FAS TEST WELLS AT S65A STRUCTURE
OSF-105
613125
1208515
Start Test Date:
28-SEP-2006 0000
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
APT
Transmissivity (ft2/day):
11424
Discharge Rate (gal/min):
1950
Horizontal K (ft/day):
Hours Pumped:
69.25
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
330
Storativity:
.0055
Tested Interval Max. (ft BLS):
550
Leakance (1/day):
.21
No. Monitored Wells:
7
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
BENNETT, M. HYDROGEOLOGIC INVESTIGATION OF THE FAS S-65A SITE, OSCEOLA COUNTY FLORIDA (OSF-104 &OSF-105). AECOM WATER. NOVEMBER, 2008.
Comments:
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FAS TEST WELLS AT S65A STRUCTURE
OSF-105
613125
1208515
Start Test Date:
22-JAN-2007 0000
Aquifer:
AVON-PARK PERMEABLE ZONE
Test Type:
APT
Transmissivity (ft2/day):
78877
Discharge Rate (gal/min):
2795
Horizontal K (ft/day):
Hours Pumped:
95
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
930
Storativity:
Tested Interval Max. (ft BLS):
1202
Leakance (1/day):
No. Monitored Wells:
7
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
BENNETT, M. HYDROGEOLOGIC INVESTIGATION OF THE FAS S-65A SITE, OSCEOLA COUNTY FLORIDA (OSF-104 &OSF-105). AECOM WATER. NOVEMBER, 2008.
Comments:
THIS TEST WAS CONDUCTED IN A HIGHLY FRACTURED INTERVAL. THE MAXIIMUM AVAILABLE PUMPING RATE WAS INADEQUATE TO PRODUCE SIGNIFICANT DRAWDOWN IN THE PRODUCTION ZONE MONITOR WELL, AND THE RECOVERY DATA FROM THE PRODUCTION WELL WAS OSCILLATORY AND NEAR INSTANTANEOUS, PREVENTING MEANINGFUL INTERPRETATION. REPORTED TRANSMISSIVITYIS A ROUGH ESTIMATE BASED ON SPECIFIC CAPACITY, IT IS BELIEVED TO BE A SIGNIFICANT UNDERESTIMATE.
Page generated at: 28-SEP-2024 20:23 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?