Start Test Date: | 03-MAY-2018 1630 | Aquifer: | UPPER FAS COMPOSITE (UF/APPZ) |
Test Type: | APT | Transmissivity (ft2/day): | 99000 |
Discharge Rate (gal/min): | 3300.00 | Horizontal K (ft/day): | |
Hours Pumped: | 21.5 | Vertical K (ft/day): | |
Tested Interval Min. (ft BLS): | 310 | Storativity: | |
Tested Interval Max. (ft BLS): | 600 | Leakance (1/day): | |
No. Monitored Wells: | 1 | Specific Capacity (gpm/ft): | |