DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ENCON INJECTION WELL
PB-1170
936563
942381
Start Test Date:
18-FEB-1986 1000
Aquifer:
BOULDER ZONE
Test Type:
APT
Transmissivity (ft2/day):
298128
Discharge Rate (gal/min):
10025
Horizontal K (ft/day):
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2839
Storativity:
Tested Interval Max. (ft BLS):
3505
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER, 1986
Comments:
T estimated greater than reported amount from specific injectivity, assumed = specific capacity based on method by Walton, 1970.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ENCON INJECTION WELL
PB-1170
936563
942381
Start Test Date:
12-NOV-1985 0001
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
561.9
Discharge Rate (gal/min):
Horizontal K (ft/day):
11.24
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2280
Storativity:
Tested Interval Max. (ft BLS):
2330
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER, 1986
Comments:
ANALYSIS METHOD: CEDERGREN (1977)
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ENCON INJECTION WELL
PB-1170
936563
942381
Start Test Date:
12-NOV-1985 0002
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
796.9
Discharge Rate (gal/min):
Horizontal K (ft/day):
3.79
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2360
Storativity:
Tested Interval Max. (ft BLS):
2570
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER, 1986
Comments:
ANALYSIS METHOD: CEDERGREN (1977)
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ENCON INJECTION WELL
PB-1170
936563
942381
Start Test Date:
12-NOV-1985 0003
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
4.89
Discharge Rate (gal/min):
Horizontal K (ft/day):
.1
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2740
Storativity:
Tested Interval Max. (ft BLS):
2790
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER, 1986
Comments:
ANALYSIS METHOD: CEDERGREN (1977)
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ENCON INJECTION WELL
PB-1170
936563
942381
Start Test Date:
12-NOV-1985 0004
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
489.7
Discharge Rate (gal/min):
Horizontal K (ft/day):
3.47
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2568
Storativity:
Tested Interval Max. (ft BLS):
2709
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
GERAGHTY & MILLER, 1986
Comments:
ANALYSIS METHOD: CEDERGREN (1977)
Page generated at: 04-OCT-2025 10:16 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?