DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
DELRAY BEACH NORTH - ASRPB-1702950679776470

Start Test Date:05-JUN-1996 1008Aquifer:INTERMEDIATE CONFINING UNIT
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):49Horizontal K (ft/day):
Hours Pumped:2.8Vertical K (ft/day):
Tested Interval Min. (ft BLS):849Storativity:
Tested Interval Max. (ft BLS):899Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL, JULY 1998 (ENGINEERING REPORT ON THE CONSTRUCTION AND TESTING OF THE ASR FACILIITY AT THE CITY OF DELRAY BEACH'S NORTH STORAGE RESERVOIR)
Comments:SPECIFIC CAPACITY: 0.37 GPM/FT.



SitePumped WellX-Coord(ft)Y-Coord (ft)
DELRAY BEACH NORTH - ASRPB-1702950679776470

Start Test Date:11-JUN-1996 0910Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):83Horizontal K (ft/day):
Hours Pumped:.92Vertical K (ft/day):
Tested Interval Min. (ft BLS):900Storativity:
Tested Interval Max. (ft BLS):952Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT C2HM HILL, JULY 1998 (ENGINEERING REPORT ON THE CONSTRUCTION AND TESTING OF THE ASR FACILITY AT THE CITY OF DELRAY BEACH'S NORTH STORAGE RESERVOIR)
Comments:STATIC WATER LEVEL=8 INCHES BELOW THE MEASURING PT. FLOWMETER NOT WORKING BECAUSE OF OBSTRUCTION. FLOWRATE IS HIGHER BECAUSE FLOWMETER IS TAKEN OFF. SAND INCREASES GREATLY, WATER IS THICK WITH SAND. SPECIFIC CAPACITY: 0.90 GPM/FT.



SitePumped WellX-Coord(ft)Y-Coord (ft)
DELRAY BEACH NORTH - ASRPB-1702950679776470

Start Test Date:14-JUN-1996 0952Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):90Horizontal K (ft/day):
Hours Pumped:3.35Vertical K (ft/day):
Tested Interval Min. (ft BLS):974Storativity:
Tested Interval Max. (ft BLS):1020Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL JULY 1998 (ENGINEERING REPORT ON THE CONSTRUCTION AND TESTING OF THE ASR FACILITY AT THE CITY OF DELRAY BEACH'S NORTH STORAGE RESERVOIR)
Comments:SPECIFIC CAPACITY: 2.40 GPM/FT.



SitePumped WellX-Coord(ft)Y-Coord (ft)
DELRAY BEACH NORTH - ASRPB-1702950679776470

Start Test Date:18-JUN-1996 1529Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):98Horizontal K (ft/day):
Hours Pumped:2.65Vertical K (ft/day):
Tested Interval Min. (ft BLS):1020Storativity:
Tested Interval Max. (ft BLS):1100Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT C2HM HILL JULY 1998 (ENGINEERING REPORT ON THE CONSTRUCTION AND TESTING OF THE ASR FACILITY AT THE CITY OF DELRAY BEACH'S NORTH STORAGE RESERVOIR)
Comments:SPECIFIC CAPACITY: 2.00 GPM/FT.

Page generated at: 04-OCT-2025 08:37 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?