DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
PALM BEACH COUNTY WATER UTIL. DEPT. WTP NO. 3- FAS ASRPB-1763938733782345

Start Test Date:30-JAN-1997 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):
Discharge Rate (gal/min):508Horizontal K (ft/day):
Hours Pumped:24Vertical K (ft/day):
Tested Interval Min. (ft BLS):985Storativity:
Tested Interval Max. (ft BLS):1200Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
US GEOLOGICAL SURVEY Data compiled in USGS WRIR 02-4036, data originally from, REESE, R, USGS WRIR 02-4036, 2002
Comments:SPECIFIC CAPACITY: 390-306 GALLONS/MIN/FT



SitePumped WellX-Coord(ft)Y-Coord (ft)
PALM BEACH COUNTY WATER UTIL. DEPT. WTP NO. 3- FAS ASRPB-1763938733782345

Start Test Date:25-FEB-1999 0000Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):8943
Discharge Rate (gal/min):530Horizontal K (ft/day):
Hours Pumped:1.5Vertical K (ft/day):
Tested Interval Min. (ft BLS):Storativity:
Tested Interval Max. (ft BLS):1155Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT PALM BEACH COUNTY WATER UTILITIES DEPARTMENT, MARCH 2003, WATER TREATMENT PLANT NO. 3 MULTIPURPOSE FLORIDAN AQUIFER STORAGE AND RECOVERY WELL PBCWUD PROJECT NO. 96-37 WELL CONSTRUCTION REPORT AND OPERATIONAL TESTING REQUEST
Comments:TRANSMISSIVITY WAS ESTIMATED DUE TO LIMITED AMOUNT OF DATA FOR ASR ZONE. THE 72-HOUR APT WAS ABSENT. THE SPECIFIC CAPACITY RATES RANGED FROM 25.2 GPM/FT AT 2100 GPM TO 47.8GPM/FT AT 530 GPM. WELL WAS PUMPED FOR 1.5 HOURS AT EACH RESPECTIVE PUMPING RATE (530 GPM, 920 GPM, 1610 GPM & 2100 GPM).

Page generated at: 04-OCT-2025 03:56 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?