Start Test Date: | 27-AUG-2000 0000 | Aquifer: | UPPER FAS COMPOSITE (UF/APPZ) |
Test Type: | STEP-DRAWDOWN | Transmissivity (ft2/day): | 772358 |
Discharge Rate (gal/min): | 1745 | Horizontal K (ft/day): | |
Hours Pumped: | 6 | Vertical K (ft/day): | |
Tested Interval Min. (ft BLS): | 188 | Storativity: | |
Tested Interval Max. (ft BLS): | 377 | Leakance (1/day): | |
No. Monitored Wells: | | Specific Capacity (gpm/ft): | 2850 |