DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
BRIGHTON RESERVATION ASRSBPW-1618137997210

Start Test Date:20-APR-2009 1200Aquifer:SURFICIAL AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):1200
Discharge Rate (gal/min):84.00Horizontal K (ft/day):80
Hours Pumped:72.83Vertical K (ft/day):
Tested Interval Min. (ft BLS):24Storativity:.00038
Tested Interval Max. (ft BLS):39Leakance (1/day):.01
No. Monitored Wells:8Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT ENTRIX 2009 TECHNICAL MEMORANDUM: SITE TESTING AND SUPPLEMENTAL MODELING FOR A BANK FILTRATION SYSTEM AT THE SEMINOLE BRIGHTON ASR PILOT PROJECT
Comments:TRANS IS AVG FROM CJ AND THEIS RECOVERY METHODS. SEE ANALYSIS INFO FOR DETAILS.SPECIFIC CAPACITY = 0.006 GPM/FT



SitePumped WellX-Coord(ft)Y-Coord (ft)
BRIGHTON RESERVATION ASRSBPW-1618137997210

Start Test Date:17-APR-2009 1523Aquifer:SURFICIAL AQUIFER SYSTEM
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:1.5Vertical K (ft/day):
Tested Interval Min. (ft BLS):24Storativity:
Tested Interval Max. (ft BLS):39Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT ENTRIX 2009 TECHNICAL MEMORANDUM: SITE TESTING AND SUPPLEMENTAL MODELING FOR A BANK FILTRATION SYSTEM AT THE SEMINOLE BRIGHTON ASR PILOT PROJECT
Comments:STEPPED RATES 45,72,106 GPM

Page generated at: 28-SEP-2024 21:39 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?