DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASSCRWWTPIW2418594640880

Start Test Date:25-MAY-0004 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):1.74
Discharge Rate (gal/min):6Horizontal K (ft/day):.45
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):1717Storativity:
Tested Interval Max. (ft BLS):1740Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL #2 WELL COMPLETION REPORT, DECEMBER 2004
Comments:PACKER TEST 1 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL



SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASSCRWWTPIW2418594640880

Start Test Date:28-MAY-0004 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):.93
Discharge Rate (gal/min):2.5Horizontal K (ft/day):.025
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):1950Storativity:
Tested Interval Max. (ft BLS):1990Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:PACKER TEST 2 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL



SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASSCRWWTPIW2418594640880

Start Test Date:06-JUN-0004 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):27.57
Discharge Rate (gal/min):36Horizontal K (ft/day):.72
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):2252Storativity:
Tested Interval Max. (ft BLS):2290Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:PACKER TEST 3 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL



SitePumped WellX-Coord(ft)Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FASSCRWWTPIW2418594640880

Start Test Date:07-JUN-0004 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):85.37
Discharge Rate (gal/min):78Horizontal K (ft/day):3.15
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):2452Storativity:
Tested Interval Max. (ft BLS):2480Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:PACKER TEST 4 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL

Page generated at: 28-SEP-2024 19:26 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?