DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
ROMP Cypress Bridge TPW-1W-159772131001409178

Start Test Date:17-JUN-1986 1030Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):57398
Discharge Rate (gal/min):2150Horizontal K (ft/day):
Hours Pumped:144Vertical K (ft/day):
Tested Interval Min. (ft BLS):130Storativity:.0007
Tested Interval Max. (ft BLS):700Leakance (1/day):.00006
No. Monitored Wells:5Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT DATA COMPILED BY THE SWFMWD, ORIGINALLY FROM , CAMP DRESSER & MCKEE, DECEMBER 1986
Comments:Drawdowns corrected for regional trends and barometric changes. Typical dry season water level trend. However, minor rainfall event was experienced during the APT.:Tested Formation -S-O-AP

Page generated at: 04-OCT-2025 06:59 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?