DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:18-NOV-1986 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):.62
Discharge Rate (gal/min):2Horizontal K (ft/day):.088
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):2042Storativity:
Tested Interval Max. (ft BLS):2049Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD IS JACOB MODIFIED



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:19-NOV-1986 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):6.96
Discharge Rate (gal/min):1.25Horizontal K (ft/day):.99
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):2016Storativity:
Tested Interval Max. (ft BLS):2023Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD IS JACOB MODIFIED STEP TEST (PART1)



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:19-NOV-1986 0100Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):3.52
Discharge Rate (gal/min):3.5Horizontal K (ft/day):.5
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):2016Storativity:
Tested Interval Max. (ft BLS):2023Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD IS JACOB MODIFIED STEP TEST (PART 2)



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:19-NOV-1986 0200Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):4.11
Discharge Rate (gal/min):0Horizontal K (ft/day):.59
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):2016Storativity:
Tested Interval Max. (ft BLS):2023Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD FROM RECOVERY



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:19-NOV-1986 0300Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):.41
Discharge Rate (gal/min):0Horizontal K (ft/day):.058
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):1897Storativity:
Tested Interval Max. (ft BLS):1904Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD IS FROM RECOVERY



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:20-NOV-1986 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):.27
Discharge Rate (gal/min):.5Horizontal K (ft/day):.039
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):1905Storativity:
Tested Interval Max. (ft BLS):1912Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD IS JACOB MODIFIED



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:20-NOV-1986 0100Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):.33
Discharge Rate (gal/min):0Horizontal K (ft/day):.046
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):1905Storativity:
Tested Interval Max. (ft BLS):1912Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:ANALYSIS METHOD FROM RECOVERY



SitePumped WellX-Coord(ft)Y-Coord (ft)
PORT MALABAR DEEP INJECTION WELL SITEW-161337850181342114

Start Test Date:01-DEC-1986 0000Aquifer:BOULDER ZONE
Test Type:SPECIFIC CAPACITYTransmissivity (ft2/day):29356
Discharge Rate (gal/min):5000Horizontal K (ft/day):
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):2050Storativity:
Tested Interval Max. (ft BLS):2522Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. JULY 1987. DRILLING AND TESTING OF THE DEEP INJECTION WELL SYSTEM ( # 27 FROM FDEP'S INJ WELL DATABASE)
Comments:SPECIFIC CAPACITY=100 GPM/FT (CORRECTED FOR FRICTION LOSSES). TRANSMISSIVITY WAS ESTIMATED FROM THE SPECIFIC CAPACITY. WATER-QUALITY DATA COLLECTED DURING DRILLING 8-3-86 TO 1-5-87

Page generated at: 04-OCT-2025 14:03 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?