DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
ROMP 9 North PortW-170015411531023577

Start Test Date:12-JUN-1995 0000Aquifer:SURFICIAL AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):16300
Discharge Rate (gal/min):889Horizontal K (ft/day):57.7
Hours Pumped:167.04Vertical K (ft/day):68.1
Tested Interval Min. (ft BLS):30Storativity:.0016
Tested Interval Max. (ft BLS):300Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , SWFWMD ROMP 14 HICORIA, FEBRUARY 1998
Comments:DRAWDOWN MEASURED IN NUMEROUS SURFICIAL AQUIFER MONITOR WELLS. APT PARAMETERS REPRESENT THE AVERAGE OF THREE ANALYTICAL METHODS. THIS APT ENCOMPASSES THE LOWER PORTION OF THE ARCADIA FORMATION OF THE HAWTHORN GROUP.



SitePumped WellX-Coord(ft)Y-Coord (ft)
ROMP 14 Hicoria - Well No 1W-170015411531023577

Start Test Date:07-FEB-1996 0000Aquifer:MID-HAWTHORN AQUIFER
Test Type:APTTransmissivity (ft2/day):31.2
Discharge Rate (gal/min):14.65Horizontal K (ft/day):.529
Hours Pumped:52.2Vertical K (ft/day):
Tested Interval Min. (ft BLS):460Storativity:.0025
Tested Interval Max. (ft BLS):521Leakance (1/day):.000005
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , SWFWMD ROMP 14 HICORIA REPORT, FEBRUARY 1998.
Comments:



SitePumped WellX-Coord(ft)Y-Coord (ft)
ROMP 14 Hicoria - Well No 1W-170015411531023577

Start Test Date:09-SEP-1996 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):7580
Discharge Rate (gal/min):1651.19Horizontal K (ft/day):11.36
Hours Pumped:118Vertical K (ft/day):
Tested Interval Min. (ft BLS):1003Storativity:.000022
Tested Interval Max. (ft BLS):1670Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , SWFWMD ROMP, 1998
Comments:APT PARAMETERS REPRESENT THE AVERAGE OF TWO ANALYTICAL METHODS. NO DRAWDOWN DATA COULD BE MADE USEFUL FOR CALCULATION OF PARAMETERS. HOWEVER, RECOVERY DATA WERE USED TO CALCULATE T AND S. LOW TRANSMISSIVITY MAY BE ATTRIBUTED IN PART TO WELL CONSTRUCTION. THIS TEST DID NOT PENETRATE THE MOST PERMEABLE SECTION OF THE AVON PARK.



SitePumped WellX-Coord(ft)Y-Coord (ft)
ROMP 14 Hicoria - Well No 1W-170015411531023577

Start Test Date:11-APR-1995 0000Aquifer:MIDDLE FAS CONFINING UNIT
Test Type:PACKERTransmissivity (ft2/day):.22
Discharge Rate (gal/min):0.47Horizontal K (ft/day):.0027
Hours Pumped:2.0834Vertical K (ft/day):
Tested Interval Min. (ft BLS):1937Storativity:
Tested Interval Max. (ft BLS):1997Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , ROMP 14 HICORIA MONITOR WELL SITE, HIGHLANDS COUNTY, FINAL REPORT- DRILLING & TESTING PROGRAM, FEBRUARY 1998.
Comments:

Page generated at: 04-OCT-2025 05:11 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?