DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ROMP TR 4-1
W-17488
186128
992770
Start Test Date:
21-FEB-1997 1000
Aquifer:
SANDSTONE AQUIFER
Test Type:
APT
Transmissivity (ft2/day):
129
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
24
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
22
Storativity:
Tested Interval Max. (ft BLS):
104
Leakance (1/day):
.0072
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
SOUTHWEST FLORIDA WMD
SWFWMD, 1997. HYDROGEOLOGY OF THE ROMP TR 4-1 CASPERSEN BEACH WELLSITE SARASOTA COUNTY, FL.
Comments:
ACTUAL PUMPED WELL MW2, LEAKANCE FROM WALTON-HANTUSH ANALYSIS REPORTED HERE, SEE REPORT FOR ADDITIONAL DETAIL
Page generated at: 04-OCT-2025 08:38 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?