DBHYDRO       reports

Lithologic Interval Details

Well Name X-Coord
(feet)
Y-Coord
(feet)
W-17691 614722 1059786

Min.
Depth
(feet)
Max.
Depth
(feet)
Primary Rock %
Primary
Rock
Primary Color Induration %
Porosity
Comments
0 1.5 SAND (QUARTZ) GRAYISH BROWN UNCONSOLIDATED ORGANICS AND PLANT REMAINS DECREASE WITH DEPTH.
1.5 7.8 SAND (QUARTZ) GRAYISH BROWN POOR CLAY VARIES 2-15%. CLAY CONCENTRATED IN LENSES. CLAY IS ORGANIC RICH. HYDRAULIC CONDUCTIVITY TESTED AT 7.5'. AVERAGE K: 7.79E-04 CM/SEC OR 2.21E+00 FT/DAY.
7.8 9.8 SAND (QUARTZ) YELLOWISH GRAY POOR INTERVAL WAS PUMPED. CLAY VARIES 1-5%. CLAY CONCENTRATED IN BLEBS.
9.8 11 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS BAILED.
11 12.5 SAND (QUARTZ) INTERVAL WAS BAILED.
12.5 13.5 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS BAILED.
13.5 16.3 SAND (QUARTZ) GRAYISH BROWN POOR INTERVAL WAS BAILED. SOME CLAY IS CONCENTRATED IN BLEBS.
16.3 18.3 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS BAILED. SOME CLAY IS CONCENTRATED IN BLEBS.
18.3 18.8 SAND (QUARTZ) VERY PALE ORANGE UNCONSOLIDATED A FEW BLEBS OF ORGAINC RICH CLAY. HYDRAULIC CONDUCTIVITY TESTED AT 18.5'. AVERAGE K: 1.36E-03 CM/SEC OR 3.86E+00 FT/DAY.
18.8 20.5 SAND (QUARTZ) VERY LIGHT GRAY POOR INTERVAL WAS BAILED. SOME ORGANIC RICH CLAY IN BLEBS.
20.5 23.5 SAND (QUARTZ) VERY PALE ORANGE UNCONSOLIDATED INTERVAL WAS BAILED.
23.5 26 SAND (QUARTZ) VERY PALE ORANGE UNCONSOLIDATED INTERVAL WAS PUMPED.
26 29.5 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS PUMPED. LAYER OF ORGANIC RICH CLAY NEAR BASE OF INTERVAL.
29.5 32.5 SAND (QUARTZ) VERY PALE ORANGE UNCONSOLIDATED INTERVAL WAS PUMPED.
32.5 34 SAND (QUARTZ) VERY PALE ORANGE UNCONSOLIDATED INTERVAL WAS PUMPED.
34 35.8 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS PUMPED. SOME CLAY IN BLEBS.
35.8 38.5 SAND (QUARTZ) GRAYISH BROWN POOR INTERVAL WAS PUMPED. SOME CLAY IN BLEBS.
38.5 41 SAND (QUARTZ) VERY PALE ORANGE POOR INTERVAL WAS PUMPED. CLAY MOSTLY IN BLEBS.
41 43 SAND (QUARTZ) GRAYISH BROWN POOR CLAY AND ORGANICS CONCENTRATED IN BLEBS AND LENSES.
43 45.5 SAND (QUARTZ) LIGHT GRAY UNCONSOLIDATED INTERVAL WAS PUMPED. CLAY IS IN SMALL BLACK BLEBS.
45.5 47 SAND (QUARTZ) GRAYISH BROWN UNCONSOLIDATED POOR SAMPLE RECOVERY. NO VIABLE HYDRAULIC CONDUCTIVITY SAMPLE RECOVERED.
47 48.5 SAND (QUARTZ) LIGHT OLIVE GRAY POOR
48.5 50 SAND (QUARTZ) LIGHT GRAY UNCONSOLIDATED INTERVAL WAS PUMPED. HYDRAULIC CONDUCTIVITY TESTED AT 48.5'. AVERAGE K: 4.96E-03 CM/SEC OR 1.41E+01 FT/DAY.
50 51 SAND (QUARTZ) LIGHT OLIVE GRAY POOR
51 51.5 SAND (QUARTZ) YELLOWISH GRAY POOR
51.5 52.5 NO SAMPLE
52.5 55.5 SAND (QUARTZ) VERY LIGHT GRAY UNCONSOLIDATED INTERVAL WAS PUMPED. CLAY IS IN BLEBS.
55.5 58 SAND (QUARTZ) INTERVAL WAS PUMPED.
58 60.5 SAND (QUARTZ) LIGHT OLIVE GRAY UNCONSOLIDATED INTERVAL WAS PUMPED.
60.5 66 SAND (QUARTZ) LIGHT OLIVE GRAY UNCONSOLIDATED PUMPED SAMPLE (CUTTINGS) MOST SAMPLE RECOVERED IS SLIGHTLY SHELLY SAND WITHOUT MATRIX. SOME RECOVERED AS CLASTS OF CLAYEY SHELLY SAND-PROBABLY THE ACTUAL LITHOLOGY.
66 69 SAND (QUARTZ) LIGHT OLIVE GRAY POOR INTERVAL WAS PUMPED. ABUNDANT CLASTS OR BLEBS OF CLAYEY SHELLY SAND RECOVERED-PROBABLY THE ORIGINAL BULK LITHOLOGY.

Page generated at: 02-JUL-2024 16:57 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?