Report generation started at 01/15/2021 21:32:12
Data for this report was last updated on 01/14/2021 10:51:35
NOTE: The values shown below are displayed in Eastern Standard Time (EST). While water levels are monitored 24 hours a day, some gauges listed on this page may be temporarily out of service.
REALTIME HOME PAGE>> FORT_PIERCE
Click on a record below to view detailed Data.
  • "db" link is to DBHYDRO information
  • "JN/SITE" locations can be a Junction (JN) or Site
  • Hydraulic Element Set (HES) name suffix designate the control types of -C (Culvert), -P (Pump), -L (Lock), -S (Spillway), or -F (Flashboard).
  • Upstream, Downstream, and Flow data are in black color if the value is recorded in last one hour. Purple if between 1 and 24 hours. Brown if more than 24 hours old.
  Flow - (cfs)     Stage - (Feet, NGVD)
Gates - (Opening in Feet)
Weirs - (Crest Elev Feet, NGVD)
Pumps - (Revolutions per Minute)
G78 G78-C 21.60  22.21  No Weir Flow 23.74              
G79 G79-C 22.37  20.18  All Gates Closed 3 Weirs Bays 22ft 22.01   22.00   22.00   .05   -.00   -.01    
G81 G81-C -.02  .00  Unavailable   1 Gate open 20.41ft              
S48 S48-W 8.00  1.47  No Weir Flow 8.00              
S49 S49-S 20.15  1.68  55  1 Gate Open 0.12ft .01   .12            
S50 S50-W 12.13  .00  20  1 Weir Bays -13.8ft -13.80              
S97 S97-S 21.74  7.97  All Gates Closed .00   .00            
S99 S99-S 22.22  12.01  All Gates Closed .02   .00            
VERANO VERANO-C -997.52  20.18  Unavailable   All Gates Closed .00              
           
           
    20.15     1.68    
    21.74     7.97    
    22.22     12.01