DBHYDRO       reports

Construction Details Report

Well NameHORSE_ASR
DescriptionCITY OF CAPE CORAL HORSESHOE CANAL ASR EXW
Latitude [NAD83]264053.4
Longitude [NAD83]820149.2
FL State Plane East [NAD83]319718.993
FL State Plane North [NAD83]854755.631
CountyLee
Land Surface Elev. [NGVD29]4.87
Elevation SourceSFWMD GIS
Elevation Error [ft] +/-.656
Land Surface Elev. [NAVD88]3.69
Total Depth [FT BLS]910
Completion Date15-SEP-2008
Hole Diameter8.6
Well OwnerCITY OF CAPE CORAL
Driller NameRowe Drilling SHODDY
Drilling MethodMUD ROTARY
Construction CommentsGEOLOGIC FORMATION SAMPLES WERE COLLECTED AND DESCRIBED AT 10-FOOT INTERVALS DURING THE PILOT HOLE DRILLING.
Construction Date15-SEP-2008
Destroy Date
Drilling CommentsREVERSE AIR DRILLING METHOD ALSO USED
Development MethodP
Development Hours3
General CommentsCOMPLETED AS PRODUCTION WELL, UNSUITABLE FOR ASR, BULK CONDUIT FLOW



Page generated at: 29-SEP-2024 01:21 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?