DBHYDRO       reports

Construction Details Report

Well NameNLCPW-17A
DescriptionNorth Lee County WTP Supply Well PW-17A
Latitude [NAD83]264252.362
Longitude [NAD83]814819.228
FL State Plane East [NAD83]393267.641
FL State Plane North [NAD83]866239.507
CountyLee
Land Surface Elev. [NGVD29]
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]4.41
Total Depth [FT BLS]548
Completion Date15-NOV-2010
Hole Diameter16
Well OwnerLEE COUNTY UTILITIES
Driller NameFestus - Diversified Drilling Corporation
Drilling MethodMUD ROTARY
Construction CommentsGEOLOGIC FORMATION SAMPLES WERE COLLECTED AND DESCRIBED AT 5-FOOT INTERVALS DURING THE PILOT HOLE DRILLING.
Construction Date15-NOV-2010
Destroy Date
Drilling CommentsMUD ROTARY DRILLING TO 548'. LOSS OF CIRCULATION @ 426'. BACKPLUGGED WELL WITH GRAVEL TO CASING SETTING DEPTH (418'). CLEANOUT GRAVEL BY REVERSE AIR DRILLING TO 500'.
Development MethodC
Development Hours10
General Comments



Page generated at: 29-SEP-2024 01:25 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?