DBHYDRO       reports

Construction Details Report

Well NameOSF-105
DescriptionDUAL-ZONE PRODUCTION WELL FOR OSF-104 TEST
Latitude [NAD83]273929.98
Longitude [NAD83]810758.69
FL State Plane East [NAD83]613125.397
FL State Plane North [NAD83]1208514.733
CountyOsceola
Land Surface Elev. [NGVD29]49.34
Elevation SourceSURVEY
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]48.1
Total Depth [FT BLS]1750
Completion Date12-OCT-2012
Hole Diameter12
Well OwnerSFWMD
Driller NameROWE DRILLING (2007) - PHASE I ALL WEBBS ENTERPRISES (2012) - PHASE II
Drilling MethodAIR-ROTARY
Construction Comments
Construction Date12-OCT-2012
Destroy Date
Drilling CommentsORIGINALLY DRILLED IN 2007 & USED AS DUAL-ZONE UPPER FLORIDAN PW PHASE II - WELL DEEPENED TO 1,750 FT BLS TO SERVE AS MONITOR WELL FOR LOWER FLORIDAN APT, THEN BACK-FILLED TO 1,300.
Development Method
Development Hours
General CommentsORIGINALLY DRILLED TO 1,220 FT IN DEPTH, DEEPENED IN 2012 TO 1,750, THEN BACK-FILLED TO 1,300 FT.



Page generated at: 29-SEP-2024 00:23 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?