DBHYDRO       reports

Construction Details Report

Well NameG-2899
DescriptionG2899
Latitude [NAD83]260805.31
Longitude [NAD83]800937.07
FL State Plane East [NAD83]931659.619
FL State Plane North [NAD83]655578.416
CountyBroward
Land Surface Elev. [NGVD29]5.12
Elevation SourceSURVEY
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]3.54
Total Depth [FT BLS]165
Completion Date14-NOV-1997
Hole Diameter2
Well OwnerSOUTH FLORIDA WATER MANAGEMENT DISTRICT
Driller NameHydro. Ass.
Drilling MethodOTHER
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsMONITORED FOR SALTWATER INTRUSION. AUTOMATED WELL CONSTRUCTION UPDATE FROM USGS NWIS DATABASE ON (10-15-2004) C. FISCHLER 011-36 DNRP-8 CARTER PK G-2899 5FT INTERVALS ELEVATION ESTIMATED FROM TOPO MAP. CORE SECTIONS ARE LABELED AS A 5 FT. INTERVAL BUT CONSIST OF ABOUT 12 INCHES OR LESS OF ACTUAL SAMPLE.



Page generated at: 30-JUN-2024 19:22 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?