DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
COLLIER ENT.- CROWS NEST SO.CROW_PW607587760113

Start Test Date:14-MAR-1988 0000Aquifer:LOWER TAMIAMI AQUIFER
Test Type:APTTransmissivity (ft2/day):
Discharge Rate (gal/min):2350Horizontal K (ft/day):2507
Hours Pumped:70.5Vertical K (ft/day):.004
Tested Interval Min. (ft BLS):65Storativity:.00016
Tested Interval Max. (ft BLS):105Leakance (1/day):.073
No. Monitored Wells:3Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTH FLORIDA WMD TP 88-12149
Comments:Interference from off-site pumping ~ 1-2 hour into test created about 1' extra drawdown.

Well Name X Coord
(ft)
Y Coord
(ft)
Analysis Method Distance
from
Production
Well
(ft)
Max.
Drawdown
(ft)
Transmissivity
(ft**2/day)
Storativity Leakance
CROW_1
607587
760113
COOPER-JACOB APPROXIMATION
108
3.45
102869
.012
.0035
CROW_2
607587
760113
COOPER-JACOB APPROXIMATION
620
2.27
90010
.0002
.0094
CROW_3
607587
760113
COOPER-JACOB APPROXIMATION
1215
1.98
138477
.00017
.00094

Page generated at: 01-NOV-2024 04:23 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?