DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FAS
MC-5057
440785
669257
Start Test Date:
30-SEP-2000 2300
Aquifer:
INTERMEDIATE AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
13099
Discharge Rate (gal/min):
370
Horizontal K (ft/day):
131
Hours Pumped:
96
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
299
Storativity:
.00015
Tested Interval Max. (ft BLS):
399
Leakance (1/day):
.00017
No. Monitored Wells:
1
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
MDM/MISSIMER INTERNATIONAL INC. OCTOBER, 2000. COLLIER COUNTY PUBLIC WORKS SOUTHERN REVERSE OSMOSIS WELLFIELD STUDY, COLLIER COUNTY, FL. PROJECT NO: FH8-812/9086-28655-DN.FWF
Comments:
PARAMETER VALUES TAKEN FROM AVERAGE OF CURVE MATCHING METHOD OF DRAWDOWN, STRAIGHT LINE OF DRAWDOWN AND RECOVERY AT MON. WELL MC-5056.
Well Name
X Coord(ft)
Y Coord(ft)
Analysis Method
DistancefromProductionWell(ft)
Max.Drawdown(ft)
Transmissivity(ft**2/day)
Storativity
Leakance
MC-5056
441453
668622
JACOB STRAIGHT-LINE (1952)
735
13770
.00012
MC-5056
441453
668622
OTHER
735
14037
.00015
.00017
MC-5056
441453
668622
RECOVERY
735
10963
.00019
MC-5069
431099
673153
JACOB STRAIGHT-LINE (1952)
405
6016
.000057
MC-5069
431099
673153
OTHER
405
5829
.000083
.000024
MC-5069
431099
673153
RECOVERY
405
5829
.00011
Page generated at: 29-SEP-2024 00:23 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?