Start Test Date: | 28-JUN-2010 0819 | Aquifer: | LOWER HAWTHORN PRODUCING ZONE |
Test Type: | STEP-DRAWDOWN | Transmissivity (ft2/day): | 58924 |
Discharge Rate (gal/min): | 1300.00 | Horizontal K (ft/day): | |
Hours Pumped: | 5 | Vertical K (ft/day): | |
Tested Interval Min. (ft BLS): | 418 | Storativity: | |
Tested Interval Max. (ft BLS): | 500 | Leakance (1/day): | |
No. Monitored Wells: | | Specific Capacity (gpm/ft): | |