DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FAS
SCRWWTPIW2
418594
640880
Start Test Date:
25-MAY-0004 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
1.74
Discharge Rate (gal/min):
6
Horizontal K (ft/day):
.45
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1717
Storativity:
Tested Interval Max. (ft BLS):
1740
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL #2 WELL COMPLETION REPORT, DECEMBER 2004
Comments:
PACKER TEST 1 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FAS
SCRWWTPIW2
418594
640880
Start Test Date:
28-MAY-0004 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
.93
Discharge Rate (gal/min):
2.5
Horizontal K (ft/day):
.025
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1950
Storativity:
Tested Interval Max. (ft BLS):
1990
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:
PACKER TEST 2 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FAS
SCRWWTPIW2
418594
640880
Start Test Date:
06-JUN-0004 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
27.57
Discharge Rate (gal/min):
36
Horizontal K (ft/day):
.72
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2252
Storativity:
Tested Interval Max. (ft BLS):
2290
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:
PACKER TEST 3 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
SO. COLLIER COUNTY WASTE WATER TREATMENT PLANT - FAS
SCRWWTPIW2
418594
640880
Start Test Date:
07-JUN-0004 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
85.37
Discharge Rate (gal/min):
78
Horizontal K (ft/day):
3.15
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2452
Storativity:
Tested Interval Max. (ft BLS):
2480
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM, SOUTH COUNTY WATER RECLAMATION FACILITY INJECTION WELL 2- WELL COMPLETION REPORT, DECEMBER 2004
Comments:
PACKER TEST 4 OF 4 PARAMETER VALUES ARE AVERAGE BETWEEN DRAWDOWN AND RECOVERY PHASES AVERAGE HYDRAULIC CONDUCTIVITY IS ASSUMED TO BE HORIZONTAL
Page generated at: 28-SEP-2024 23:34 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?