Start Test Date: | | Aquifer: | LOWER HAWTHORN PRODUCING ZONE |
Test Type: | SPECIFIC CAPACITY | Transmissivity (ft2/day): | |
Discharge Rate (gal/min): | 875 | Horizontal K (ft/day): | |
Hours Pumped: | | Vertical K (ft/day): | |
Tested Interval Min. (ft BLS): | 505 | Storativity: | |
Tested Interval Max. (ft BLS): | 720 | Leakance (1/day): | |
No. Monitored Wells: | | Specific Capacity (gpm/ft): | 17.6 |